Skip to content Skip to footer
1 LOT OF ABASTUMANI BYPASS ROAD .
The project encompasses:
• 50,000 m2 of two layers of asphalt concrete covering;
• Development of 3 bridges totaling 120 meters;
• A 380-meter-long tunnel;
• Development of retaining walls;
• Water pipes installation;