Rehabilitation of April 9 Street
The project encompasses:
• 3000 m² three-layer asphalt-concrete road surface;
• Rehabilitation of the existing drainage network on 280m²;
• Sidewalks on 1100m²;
• A new sidewalk was arranged on 380m²