GalleryRehabilitation of April 9 Street The project encompasses: • 3000 m² three-layer asphalt-concrete road surface;• Rehabilitation of the existing drainage network on 280m²;• Sidewalks on 1100m²;• A new sidewalk was arranged on 380m²