Bagebi-University Street bridge .
The project encompasses: .
• Land works were carried out - 1190m3
• Drainage network was organized - 130g/m
• Three-layer asphalt concrete road surface - 5888.59 m2
• A two-layer asphalt concrete road surface was laid on the bridge - 9247.91 m2
• Curbs and sidewalks - 2467.20m2